How long does it take to build a house?
How long does it take from the moment you decide to build a house until you can move in? Moisés Sánchez, architect, gives you the answer: - 📄PROJECT: 2 months maximum, week up week down. - 📋THE LICENSE: 6 months on average, depending on each town hall. - CONTRACTOR:
What costs more? New construction or renovation?
What option is more expensive, new construction or a comprehensive renovation? Victor Fernandez, a building surveyor, gives you the answer: - 🏚️ PROPERTY CONDITION: This is the most delicate point and often where there are the most doubts. It is important to provide a good technical assessment of the structural
What is a turnkey architectural project?
Our way of working is simple. There are four steps: 1. 🔍 TECHNICAL AND LEGAL ANALYSIS: Analysis of the property deed to ensure that everything is in order. Topographic survey and geotechnical study with all relevant information about the plot. 2. 💡 EXECUTION PROJECT AND WORK BUDGET: 2D layout design and photorealistic
What do you have to assess in a plot for building a house?
🏡 THE PLOT IS KEY We advise you on the purchase of your property, and we give you some keys: - 📏 SIZE: around 1,000 m2 is the right size to be able to implement one of our houses. - URBAN PLANNING: you must be sure that the property is buildable, and