🔑 THE PROJECT: TURNKEY

Our way of working is simple. There are four steps:

1. 🔍TECHNICAL AND LEGAL ANALYSIS: Analysis of the property deed to ensure everything is in order. Topographic survey and geotechnical study with all relevant information about the plot.

2. 💡 EXECUTION PROJECT AND WORK BUDGET: 2D design of the layout and photorealistic 3D design of the exterior; based on the needs of the property and previous plot analyses, a project is developed that defines the work technically and economically.

3. 🏗️ LICENSE OBTAINMENT AND WORK CONTROL: Processing of the construction license and search for a trustworthy builder, within previously set prices and deadlines. Work control and monthly certifications to ensure proper execution.

4. ✅ END OF WORK AND HOUSING REGISTRATION PROCEDURES: Issuance of the final work certificate, as well as management of the occupancy and first use permit, registration in the land registry, and building book. Everything necessary to legalize the housing.

FAQs
Play Video
👷 THE BUILDER: TRUSTWORTHY

To secure a reliable contractor at a reasonable price, you should have a straightforward construction project beforehand.

The preferred profile of the contractor includes:

– 🆗 RELIABLE: Reliability is crucial in all aspects of life, but even more so in the construction process. Since your home is the biggest investment of your life, it should be entrusted to a reliable builder.

– 📍LOCAL: Optimizing the price of the work and paying attention to details is best achieved when the builder is local.

– 👨‍👩‍👧‍👧 FAMILY-RUN: The person you communicate with is the head of the company and is personally committed to both the company and the project, on a professional and personal level.

There should be independence between the contractor and the supervisory team. The entity overseeing the construction should not be the same one profiting from it, as this would create a conflict of interest.

At NORTIAR, we are committed to finding a trustworthy contractor for your home within the previously agreed realistic price ranges, so you can maintain control over the total investment, ensuring the project is both technically and economically viable.

FAQs
Play Video
💰 THE PRICE: 1400€ /m2

The average price of housing for the last executed projects is 1400€/m2, with the final price of each project varying based on different factors:

⛰️ TOPOGRAPHY ADAPTATION: The housing must adapt to the topography of the plot as much as possible.

🏠 HOUSING SHAPE: It’s important to maintain simplicity in the design phase to optimize the price.

🧱 CONSTRUCTION SYSTEM: Traditional construction with load-bearing walls made of termoarcilla and a wooden or concrete roof. Continuous insulation of walls, floor, and roof.

🚪QUALITY STANDARDS: Medium to high quality standards.

🔋ENERGY EFFICIENCY: Energy rating A, including aerothermal heating and air renewal with heat recovery.

The price may vary by up to 10% depending on the decisions made in the design phase, with the average price being 1400 €/m2.

🏡 THE PLOT: WE HELP YOU

We help you buy your estate safely, and we give you some key points:

🏢 URBAN PLANNING: It is necessary to ensure that the estate is buildable, and for this, it is necessary to consult the town hall.

⛰️ TOPOGRAPHY: Although the slope can be compensated for with earthwork, it is recommended:

  • Between 0% and 10% slope for ground floor housing.

  • Between 10% and 20% slope for houses with a basement floor.

⚡ SERVICES: It is important to have nearby electricity, water, and sanitation facilities, as well as good road access. This will make the process simpler and more economical. If there are nearby houses, there will be nearby services.

📃 DEEDS: The deeds must be requested from the seller to be analyzed. It is essential to verify that, legally, everything is in order.

FAQs
Play Video
🏚️ NEW CONSTRUCTION VS RENOVATION

What option is more expensive, new construction or a comprehensive renovation? Victor Fernandez, a building surveyor, gives you the answer:

– 🏚️ PROPERTY CONDITION: This is the most delicate point and often where there are the most doubts. It is important to provide a good technical assessment of the structural condition of the property to make a realistic cost projection.

– 📏 SIZE: Does it make sense to renovate a 200 m2 home if what we need is a 120 m2 home? We believe it doesn’t.

– ⏳TIMELINES: They are practically the same as in new construction, 24 months.

In summary, except for very specific cases of renovating a home in good condition (where there is no intervention on the structure), renovation is not profitable compared to new construction.

FAQs
Play Video
📅 THE DEADLINE: 2 YEARS

How much time will pass from deciding to build a house until you can move in? Moisés Sánchez, architect, gives you the answer:

– 📄PROJECT: 2 months, give or take a week.

– 📋PERMIT: 6 months, on average, depending on each municipality.

👷 CONTRACTOR: 4 months, finding a reliable contractor who fits your project.

🏗️ CONSTRUCTION: Approximately 12 months.

📅 TOTAL: 24 months

FAQs
Play Video
🏗️ CONSTRUCTION SYSTEM

– THERMOCLAY 🧱​ + INTERNAL INSULATION 🐑

– HOUSE SEPARATED FROM THE GROUND 💧ºC

– CONTINUOUS INSULATION 🅰️+

– SIMPLICITY, DESIGN, AND SAVINGS 💰​

– LAW OF SUPPLY AND DEMAND 📈​📉​

– HEATING AND VENTILATION ♻️​

FAQs
🔑 THE PROJECT: TURNKEY

Our way of working is simple. There are four steps:

1. 🔍TECHNICAL AND LEGAL ANALYSIS: Analysis of the property deed to ensure everything is in order. Topographic survey and geotechnical study with all relevant information about the plot.

2. 💡 EXECUTION PROJECT AND WORK BUDGET: 2D design of the layout and photorealistic 3D design of the exterior; based on the needs of the property and previous plot analyses, a project is developed that defines the work technically and economically.

3. 🏗️ LICENSE OBTAINMENT AND WORK CONTROL: Processing of the construction license and search for a trustworthy builder, within previously set prices and deadlines. Work control and monthly certifications to ensure proper execution.

4. ✅ END OF WORK AND HOUSING REGISTRATION PROCEDURES: Issuance of the final work certificate, as well as management of the occupancy and first use permit, registration in the land registry, and building book. Everything necessary to legalize the housing.

FAQs
Play Video
👷 THE BUILDER: TRUSTWORTHY

To secure a reliable contractor at a reasonable price, you should have a straightforward construction project beforehand.

Preferred builder profile:

– 🆗 RELIABLE: Reliability is crucial in all aspects of life, but even more so in the construction process. Since your home is the biggest investment of your life, it should be entrusted to a reliable builder.

– 📍LOCAL: Optimizing the price of the work and paying attention to details is best achieved when the builder is local.

– 👨‍👩‍👧‍👧 FAMILY-RUN: The person you communicate with is the head of the company and is personally committed to both the company and the project, on a professional and personal level.

There should be independence between the contractor and the supervisory team. The entity overseeing the construction should not be the same one profiting from it, as this would create a conflict of interest.

At NORTIAR, we are committed to finding a trustworthy contractor for your home within the previously agreed realistic price ranges, so you can maintain control over the total investment, ensuring the project is both technically and economically viable.

FAQs
Play Video
💰 THE PRICE: 1400€ /m2

The average price of housing for the last executed projects is 1400€/m2, with the final price of each project varying based on different factors:

– ⛰️ TOPOGRAPHY ADAPTATION: The housing must adapt to the topography of the plot as much as possible.

– 🏠 HOUSING SHAPE: It’s important to maintain simplicity in the design phase to optimize the price.

– 🧱 CONSTRUCTION SYSTEM: Traditional construction with load-bearing walls made of termoarcilla and a wooden or concrete roof. Continuous insulation of walls, floor, and roof.

– 🚪QUALITY STANDARDS: Medium to high quality standards.

– 🔋ENERGY EFFICIENCY: Energy rating A, including aerothermal heating and air renewal with heat recovery.

The price may vary by up to 10% depending on the decisions made in the design phase, with the average price being 1400 €/m2

🏡 THE PLOT: WE HELP YOU

We help you buy your estate safely, and we give you some key points:

🏢 URBAN PLANNING: It is necessary to ensure that the estate is buildable, and for this, it is necessary to consult the town hall.

⛰️ TOPOGRAPHY: Although the slope can be compensated for with earthwork, it is recommended:

  • Between 0% and 10% slope for ground floor housing.

  • Between 10% and 20% slope for houses with a basement floor.

⚡ SERVICES: It is important to have nearby electricity, water, and sanitation facilities, as well as good road access. This will make the process simpler and more economical. If there are nearby houses, there will be nearby services.

📃 DEEDS: The deeds must be requested from the seller to be analyzed. It is essential to verify that, legally, everything is in order.

FAQs
Play Video
🏚️ NEW CONSTRUCTION VS RENOVATION

What option is more expensive, new construction or a comprehensive renovation? Victor Fernandez, a building surveyor, gives you the answer:

– 🏚️ PROPERTY CONDITION: This is the most delicate point and often where there are the most doubts. It is important to provide a good technical assessment of the structural condition of the property to make a realistic cost projection.

– 📏 SIZE: Does it make sense to renovate a 200 m2 home if what we need is a 120 m2 home? We believe it doesn’t.

– ⏳TIMELINES: They are practically the same as in new construction, 24 months.

In summary, except for very specific cases of renovating a home in good condition (where there is no intervention on the structure), renovation is not profitable compared to new construction.

FAQs
Play Video
📅 THE DEADLINE: 2 YEARS

How much time will pass from deciding to build a house until you can move in? Moisés Sánchez, architect, gives you the answer:

– 📄 PROJECT: 2 months, give or take a week.

– 📋 PERMIT: 6 months, on average, depending on each municipality.

👷 CONTRACTOR: 4 months, finding a reliable contractor who fits your project.

🏗️ CONSTRUCTION: Approximately 12 months.

📅 TOTAL: 24 months

FAQs
Play Video
🏗️ CONSTRUCTION SYSTEM

– THERMOCLAY 🧱​ + INTERNAL INSULATION 🐑

– HOUSE SEPARATED FROM THE GROUND 💧ºC

– CONTINUOUS INSULATION 🅰️+

– SIMPLICITY, DESIGN, AND SAVINGS 💰​

– LAW OF SUPPLY AND DEMAND 📈​📉​

– HEATING AND VENTILATION ♻️​

FAQs